WDP Hasselt Campus expansion – Randweg Hasselt
Phased development of logistics outdoor space in Hasselt
Location Randweg 23, 8061 RW Hasselt, the Netherlands
WDP is further expanding its logistics footprint for Scania in Hasselt. The trailer yard on Randweg provides the necessary parking capacity. The green section, covering 29,004 m², has been leased by Scania since June 2022 and was acquired by WDP in July 2026, with the existing lease agreement remaining in place.
The site is strategically located between Zwarte Water and Scania’s warehouses on Hanzeweg and Randweg. It supports logistics flows across multiple buildings simultaneously and provides sufficient buffer capacity for trailers waiting to be loaded or unloaded.


The development takes place in phases. Following the first phase, a second site of 22,827 m² will be acquired at the end of Q1 2027. This section will be redeveloped, with its final use and occupants still to be determined, opening up room for the campus’s future growth. The location also has its own quay facility in the form of an inlet harbour, further strengthening the campus’s multimodal accessibility and future logistics potential.







